CALL US TODAY  +612 9896 5494

4 x Netball Court Refurbishments

We were engaged by SHNA to design 4 netball courts to match in with the existing orientation of the remainder of the courts.

The existing courts were dilapidated, and a survey was conducted so the new courts would match with the existing courts.

There was a drainage channel that needed to be considered in the design which entailed drilling bored piers below the invert of the channel.

Core holes were drilled in the existing slab to determine the thickness for dowelling.

The budget was tight and the project was delivered on time and within budget with great results.

Services Provided

Structural Engineering, Structural Inspection